Program Overview
The Street Overlay Program has been in effect for eight years. This annual maintenance program repaves streets and makes concrete repairs to existing curbs and sidewalks. Installation of Americans with Disabilities Act (ADA) ramps and repairs to sidewalks are incorporated into the program to create safe, walkable paths and meet federal requirements. Streets are evaluated based on asphalt condition, traffic volume and age with work being distributed evenly throughout the three City Council districts.
In the last 8 years of the Street Overlay Program, over 131.5 miles of streets have been resurfaced and a number of structurally deficient curbs have been repaired. Check out a map showing the entire
Street Overlay Project.
2018 Street Overlay Plan
The 2018 Street overlay program was suspended as funds were reallocated for a street improvement project.
2019 Street Overlay Plan
The 2019 Street overlay program has been completed. Design for 2020 Street Overlay program will commence soon.
For questions or additional information, please contact the Blue Springs Engineering Department at 816-228-0121.Streets are evaluated based on asphalt condition, traffic volume and age with work being distributed